Projects

ItemCustomer SitesContracts and Work Performed
1.Eskom Camden Power Station in Ermelo, 2004 until 2006Assisted Siemens with the Engineering upgrade of the Control and Instrumentation Project being part of the Return to service programmed of the previously mothballed Power Stations
2. Eskom Camden Power Station in Ermelo, 2006 to June 2014Maintenance of the Siemens Teleperm XP Distributed Control System and field instrumentation (Temperature sensors, Level and Pressure Transmitters, Analytical instruments, Flow meters, actuators).
3.Rand Water, 2009 till January 2011Upgrade of the Schneider Electric PLC, pressure transducers, building of new panels, cabling, serial communication modifications.
4.ABB South Africa, 2006 to 2007Upgrade of Tutuka Power Station Control and Instrumentation for Unit 1 to Unit 3.
5.Siemens Industrial Solutions, 2006Breakdown Maintenance of Siemens S5, S7 PLC and instrumentation for the Kwa Zulu Natal region
6.Rooiwaal Waste Water Treatment Works, November 2010 to July 2011Electronic upgrades to PLC’s, Adroit SCADA, Installation of instruments & cables, control system designs(Process Control), Network Design & implementation.
7.Rand Water, Swartkopjes Pumping Station, April 2010Installation of Fuji Clamp on Flow Meters, Anybus Converters, Programming of Schneider Electric PLC and Wonderware SCADA.
8.and Water, Zuikerbosch, May 2011 till July 2013Design, Manufacture, Supply, Delivery, Installation, Commissioning and Putting into Service of Automatic HTH Feeders at System 3 at Zuikerbosch Pumping Station, Design and Installation of Mechanical Hydraulic Packs, Design and Installation of Electrical and Automation Panels, PLC Software development, Design of PID Control loop, Installation of Magflow. Installation of pipework, valve, actuators, pressure switches and Rotameters.
9.East Rand Waste Water Treatment Plant, May 2013Installation and Calibration of Greyline DFM 5.0 Dirty Water Flow meters.
10.Eskom Duvha Power Station, May 2013 till February 2014Design, Installation, Manufacture and Procure Partial Upgrade of Overland Conveyor Control System and Maintenance. Solution to upgrade from old PLC technologies to Schneider Electric M340 PLC’s.
11.Three Year Maintenance Contract ERWAT, March 2014 till February 2016Maintenance of PLC, VSD, SCADA, Analytical Instruments, Level & Flow Instruments.
12.Three Year Maintenance Contract Duvha Overland Conveyor PLCMaintenance of Schneider Compact & M340 PLC, Intouch SCADA & Networks
13.Rand Water Bloemandale Pumping StationInterlock Modification to Power Factor Correction, PLC & SCADA, Slave Relays and Timers.
14.ERWAT Vlakplaats Water Care WorksSupply, Delivery installation and commissioning of the Modular programmable logic controllers Vlakplaats-WCW.